LAHomework Sign in
Los Angeles, CA 90019 · W 12th St

5154 W 12th St

Built 1954 · 1,700 sq ft
LOT 5,939 SQ FT · 1 STRUCTURE · APN 5084-029-001Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1954
Living area
1,700 sqft
Lot size
5,939 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5084-029-001

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2026
Expected 2046 to 2056From the 2026 permit
HVACOn record 2026
Expected 2041 to 2046From the 2026 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 32 homes on W 12th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileGeneral remodel: Replace Drywall In Garage (No New Walls Added) For Single Family Dwellings And Duplexes Only."Comply With Department Order Effective Date 02/16/2026. Permit Will Expire 30 Days From Issuance Date".
  • 2026
    permit on fileRoof: 10 Window Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified Bynational Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residentialbuildings, Three Stories Or Less, Per Section 150.2(B) 1B Of Title 24.1 Kitchen/2 Bathroo
  • 2026
    permit on fileGeneral remodel: Add Sill Plate Anchor Bolts And Plywood To Cripple Walls (If Existing) Per La City Standard Plan #1; No Foundation Replacement (Earthquake Hazard Reduction Per Chapter 92 Of The Los Angeles Building Code). (Houses, Residential Buildings Up To 3 Stories And Up To 4 Units).
  • 2026
    permit on fileElectrical: Upgrading Main Panel To 200 Amps, 12 New Branch Circuits, New Smoke Detectors And New Electrical Furnace. "Comply With Department Order Effective Date02/16/2026. Permit Will Expire 30 Days From Issuance Date".
  • 2026
    permit on fileHeating & cooling: Replacing Existing Hvac System And Dryer Vent. "Comply With Department Order Effective Date 02/16/2026. Permit Will Expire 30 Days From Issuance Date". Investigating Ce Fee Added.

Manage this home to schedule a service or to update the timeline.