LAHomework Sign in
Los Angeles, CA 90041 · Highland View Ave

5145 Highland View Ave

Built 2019 · 3,469 sq ft
LOT 8,207 SQ FT · 2 STRUCTURES · APN 5669-027-020Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2019
Living area
3,469 sqft
Lot size
8,207 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
4
Home type
Single-family
Parcel (APN)
5669-027-020

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
Water heaterComing up
Expected 2029 to 2034From build year 2019
20262035
See 2 more systems expected later
RoofLater
Expected 2039 to 2049Original, built 2019
HVACLater
Expected 2034 to 2039Original, built 2019
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 86 homes on Highland View Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileElectrical: Install An Electrical Vehicle Charger(S) In A Single-Family Dwelling.
  • 2023
    permit on fileSolar: [Eplan] Install 9.0 Kw Dc Roof Mounted Pv System. (20) Modules With (6) Microinverters.
  • 2022
    permit on fileGeneral remodel: Complete Work Done Under Previously Expired Permit # 18010-20000-00830. Work Is __90__% Complete (Minimum 75% Percent Completed As Determined By Inspection).
  • 2022
    permit on fileGeneral remodel: Complete Work Done Under Previously Expired Permit #17014-20000-05230. Work Is __90__% Complete (Minimum 75% Percent Completed As Determined By Inspection).
  • 2022
    permit on fileGeneral remodel: Complete Work Done Under Previously Expired Permit #18010-20000-00829. Work Is __90__% Complete (Minimum 75% Percent Completed As Determined By Inspection).
  • 2022
    permit on fileElectrical: New Underground Conduit For Existing Garage Sub Panel And New Underground Conduit With New 70Amp Sub Panel For Guest House
  • 2022
    permit on filePlumbing: Installation Of A Single Sewage Ejector.
  • 2022
    permit on filePlumbing: Replace Sewer Main By Means Of Trenchless Pipe Bursting
  • 2019
    permit on fileGeneral remodel: Chimney Repair Per L.A. City Standard Plan. · BOSTON BRICK & STONE INC
  • 2018
    permit on fileRoom addition: Major Remodel To (E) Sfd, & Add Irr. 14'-3" X 4'-2" @ Front, 29'-6" X · MURILLO SERGIO
  • 2018
    permit on fileElectrical: Electrical Permit · GUMP ANDY INC
  • 2017
    permit on file, unconfirmedPlumbing: Plumbing Permit · METRO RETROFITTING INC

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2029
    Water heater replacementExpected 2029 to 2034