LAHomework Sign in
Glendale, CA 91214 · Maryland Ave

5139 Maryland Ave

Built 1955 · 1,864 sq ft
LOT 9,176 SQ FT · 1 STRUCTURE · APN 5601-021-006Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1955
Living area
1,864 sqft
Lot size
9,176 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5601-021-006

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2003
Expected 2023 to 2033From the 2003 permit
20262035
HVACOn record 2015
Expected 2030 to 2035From the 2015 permit
20262035
Water heaterOn record 2014
Expected 2024 to 2029From the 2014 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 52 homes on Maryland Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2015
    permit on fileHeating & cooling: 1 Fau 100000Btu, 1 Up To 3Hp Motor, 1 Electrical A/C And Compressor, 1 Ducts Per Zone, 1 Connection Of Equipment To A Gas System
  • 2015
    permit on fileElectrical: 1 200 Amp Service
  • 2014
    permit on fileWater heater: 1-Water Heater
  • 2003
    permit on fileRoof: Material:Class A - No. Of Squares:26Sqs - Tear Of Existing (Y/N):Y - Existing No. Of Layers:2 - New Sheathing (Y/N):Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2023 to 2033
  • Now
    Water heater replacementExpected 2024 to 2029
  • 2030
    HVAC replacementExpected 2030 to 2035