LAHomework Sign in
Los Angeles, CA 91364 · Cerrillos Dr

5127 Cerrillos Dr

Built 1954 · 1,840 sq ft
LOT 6,732 SQ FT · 2 STRUCTURES · APN 2075-034-007Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1954
Living area
1,840 sqft
Lot size
6,732 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
2
Home type
Single-family
Parcel (APN)
2075-034-007

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 69 homes on Cerrillos Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedSolar: [Eplan] Installation Of Ess Unit And Associated Equipment In Addition To Exiting Pv System.(1) 13.5Kwh Hybrid Ess(1) 200A Energy Management Panel(1) 225 Backup Loads Panel*** Applicant Work Description Below: *** Addition Of Energy Storage System (1) Tesla: Powerwall 3 1707000-Xx-Y, 13.5 Kwh Ac Batt
  • 2026
    permit on file, unconfirmedElectrical: [E-Plan] 1. Updated The Bulp Panel Rating To 225A.2. Relocated The Gw3 And Bulp Immediately To The Right Of The Msp.3. Relocated The Acd And Ess Toward The North Corner Of The Home While Maintaining Thesame Exterior Wall.
  • 2024
    permit on file, unconfirmedPlumbing: Installation Of (1) Sgsov
  • 2023
    permit on fileSolar: Installation Of Roof-Mounted Microinverter/Ac Module Solar Pv System, Notexceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling.

Manage this home to schedule a service or to update the timeline.