LAHomework Sign in
Los Angeles, CA 91364 · Winnetka Ave

5124 Winnetka Ave

Built 1951 · 2,798 sq ft
LOT 15,978 SQ FT · 2 STRUCTURES · APN 2166-007-008Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1951
Living area
2,798 sqft
Lot size
15,978 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
2166-007-008

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2020
Expected 2040 to 2050From the 2020 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2020
Expected 2030 to 2035From the 2020 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 111 homes on Winnetka Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on file, unconfirmedRoom addition: Add (N) Walk In Closet (Irr 17'-9" X 12'-2") To Rear Of (E) 1-Story Sfd W/ Attached Garage
  • 2020
    permit on fileRoof: Interior Non-Structural Remodel To (E) Sfd To Convert (E) Bathroom And Portion Of (E) Bedroom To New Bedroom And Convert (E) Fau Closet To New Bathroom. Re-Roof And Replace All Windows (Same Size And Location).
  • 2020
    permit on fileKitchen: Interior Remodelto (E) Sfd To Relocate (E) Kitchen, Create New Bedroom And Bathroom, Remodel Master Bedroom And Bathroom, Create New Laundry Room, And Relocate The Front Entry. Work Per Engineer.
  • 2020
    permit on fileElectrical: Upgrade 200Amp Panel
  • 2020
    permit on fileWater heater: New Tankless Water Heater

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2030
    Water heater replacementExpected 2030 to 2035