LAHomework Sign in
Los Angeles, CA 90062 · Cimarron St

5107 Cimarron St

Built 1911 · 1,310 sq ft
LOT 5,176 SQ FT · 2 STRUCTURES · APN 5015-022-032Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1911
Living area
1,310 sqft
Lot size
5,176 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
5015-022-032

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 217 homes on Cimarron St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedGeneral remodel: Water Damage, Termite Damage/ Dry Rot Repair Less Than 10% Of Replacement Cost Of Residential Buildings. "Comply With Department Order Effective Date05/16/2023. Permit Will Expire 30 Days From Issuance Date". Allpermits Shall Be For The Same Time Period Limitation. Ifadditional Assistance Is Needed,
  • 2025
    permit on fileKitchen: Beam To Be Installed / New Electrical Outlets / New Kitchen Remodel / Add 1 Bathroom In Existing Single Family Dewlling Per Engineer Design (All Interior Improvement)"Comply With Department Order Effective Date 05/16/2023. Permit Will Expire 30 Days From Issuance Date". Ceis Case Number Is 983995.
  • 2022
    permit on filePlumbing: Installation Of (1) Sgsov For Home Sale
  • 2020
    permit on file, unconfirmedSolar: Pv Solar Installation, Sub-Panel 100 Amps.
  • 2020
    permit on file, unconfirmedSolar: Installation Of Roof-Mounted Solar Pv System, Not Exceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling
  • 2020
    permit on fileSolar: Installation Of Roof-Mounted Solar Pv System, Not Exceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling
  • 2020
    permit on fileElectrical: Mpu To 200A

Manage this home to schedule a service or to update the timeline.