LAHomework Sign in
Glendale, CA 91206 · E Lexington Dr

509 E Lexington Dr

Built 1940 · 1,367 sq ft
LOT 2,275 SQ FT · 2 STRUCTURES · APN 5643-008-021Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1940
Living area
1,367 sqft
Lot size
2,275 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5643-008-021

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2004
Expected 2024 to 2034From the 2004 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2015
Expected 2025 to 2030From the 2015 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 145 homes on E Lexington Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2015
    permit on fileWater heater: 1 Water Heater.
  • 2004
    permit on fileRoof: Material:Class A - No. Of Squares:14 - Tear Off Existing (Y/N):Y - Existing No. Of Layers:3 - New Sheathing (Y/N):Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -
  • 2004
    permit on fileRoof: Material:Class A - No. Of Squares:4 - Tear Off Existing (Y/N):Y - Existing No. Of Layers:3 - New Sheathing (Y/N):Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -
  • 2004
    permit on fileElectrical: Increasing Service To 200 Amps.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2024 to 2034
  • Now
    Water heater replacementExpected 2025 to 2030