LAHomework Sign in
Los Angeles, CA 91364 · Topanga Canyon Blvd

5067 Topanga Canyon Blvd

Built 1952 · 1,472 sq ft
LOT 6,225 SQ FT · 1 STRUCTURE · APN 2169-010-004Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1952
Living area
1,472 sqft
Lot size
6,225 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
2
Home type
Single-family
Parcel (APN)
2169-010-004

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2022
Expected 2032 to 2037From the 2022 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 147 homes on Topanga Canyon Blvd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedElectrical: Branch Circuit For A/C Disconnect.
  • 2025
    permit on file, unconfirmedElectrical: Branch Circuit For A/C Disconnect.
  • 2025
    permit on file, unconfirmedHeating & cooling: Replacement 3-Ton Goodman Package Unit On Roof.
  • 2025
    permit on file, unconfirmedHeating & cooling: Replacement 3 Ton Goodman Package Unit On Roof.
  • 2022
    permit on fileElectrical: Provide New Circuits Per Code To Backnit. Run Dedicated Circuits For Back Unit. Keep Existing Sub Panel For Front Unit. Create New 100 Amp Subpanel For Back Unit. Replace Main Panel
  • 2022
    permit on fileWater heater: "Comply With Department Order Effective Date10/05/2021. Permit Will Expire 30 Days From Issuance Date"Tankless Water Heater , Gas Line Repair , Water Line Repair And Drain Line Repair
  • 2022
    permit on filePlumbing: Replacement Of Shower Fixtures And Shower Corner.
  • 2021
    permit on fileRoom addition: Eplan. Conversion Of A Portion Of (E) Sfd Into An Adu Per State Law 65852.2(E)(1)(A) And Rear Adition To Sfd.**Comply With Department Order Effective Date 12/07/2020. Permit Will Expire 30 Days From Issuance Date".
  • 2021
    permit on filePlumbing: Please Help Me To Get A Permit To Repair Water Damage. Need New Faucet And Sink As I Was Told By Senior Inspector Robert Sunseri.
  • 2021
    permit on filePlumbing: Cracked Tile In The Bathroom, Bathroom Tile Replace
  • 2020
    permit on fileSolar: Installation Of Roof-Mounted Solar Pv System, Not Exceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling
  • 2020
    permit on file, unconfirmedSolar: Installation Of Roof-Mounted Solar Pv System, Not Exceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling
  • 2017
    permit on file, unconfirmedGeneral remodel: Window (7) Change-Out (Same Size & Type) For Residential Buildings. D · A TO Z CONSTRUCTION INC

Manage this home to schedule a service or to update the timeline.