LAHomework Sign in
Los Angeles, CA 91607 · Wilkinson Ave

5016 Wilkinson Ave

Built 1965 · 3,275 sq ft
LOT 6,579 SQ FT · 2 STRUCTURES · APN 2356-024-037Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1965
Living area
3,275 sqft
Lot size
6,579 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
6
Home type
Single-family
Parcel (APN)
2356-024-037

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2021
Expected 2036 to 2041From the 2021 permit
Water heaterOn record 2021
Expected 2031 to 2036From the 2021 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 154 homes on Wilkinson Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on file, unconfirmedRoom addition: Enclose (E) Covered Porch, (N) Roof And Raise Ceiling In (E) Pantry, And (N) Covered Porch In Front Portion Of The Building. Per Engineering Design.
  • 2021
    permit on fileGeneral remodel: Replace 12 Window(S). Same Size, Location, Number, Type. Replace Drywall/Plaster (Patch And Paint). Non-Structural Repair Only. Replace Damaged Wood Framing (Less Than 10%). Same Size, Spacing, Type.
  • 2021
    permit on file, unconfirmedRoof: Reroof With 30 Sqrs Comp Shingle Roofing. Existing Solid Sheathing.Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labeled And Certified By Cool Roof Rating Council (Crrc). Cool Roof May
  • 2021
    permit on fileKitchen: Sandblast/Restucco Over Existing Stucco To Remain. Area = 2400 Sqft. Interior Kitchen Remodel/Repair (No Changes In Walls Or Openings). Interior Bathroom Remodel/Repair (No Changes In Walls Or Openings). Add Sill Plate Anchors Bolts And Cripple Wall Plywood Per L.A. City Std. Plan #1; No Foundation
  • 2021
    permit on fileRoom addition: Garage Conversion To Adu And New 2Nd Story Addition
  • 2021
    permit on fileGeneral remodel: Replace Drywall/Plaster (Patch And Paint). Non-Structural Repair Only.
  • 2021
    permit on fileElectrical: Up Grade Existing Main Panel 200 Amp3 Bath Fans And 15 Circuits
  • 2021
    permit on fileElectrical: Main Electrical Panel Upgrade To 200 Amp Double Meter And Full Rewire.
  • 2021
    permit on fileHeating & cooling: Install 1-5 Ton Split System Unit
  • 2021
    permit on fileWater heater: Repair Existing Water Linesinstall 3 Water Closets Install 3 Bath Sinks Install 1 Kitchen Sink Install 1 Thankless Gas Water Heater 3 Shower Valves
  • 2016
    permit on filePlumbing: Plumbing Permit · OWNER-BUILDER
  • 2016
    permit on fileGeneral remodel: (1) Door Change-Out (Same Size & Type) For Residential Buildings. Dua · OWNER-BUILDER
  • 2015
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. · OWNER-BUILDER

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2031
    Water heater replacementExpected 2031 to 2036