LAHomework Sign in
Covina, CA 91724 · N Garsden Ave

5015 N Garsden Ave

Built 1956 · 1,677 sq ft
LOT 8,127 SQ FT · 2 STRUCTURES · APN 8401-008-003Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1956
Living area
1,677 sqft
Lot size
8,127 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
8401-008-003

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 128 homes on N Garsden Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on file, unconfirmedSolar: Roof Mount Solar Pv System Size: 3160W Dc, 3800W Ac • Modules: (8) Ja Solar: Jam54S31-395/Mr • Inverters: (1) Solaredge Technologies: Se3800H-Usmn
  • 2023
    permit on file, unconfirmedPlumbing: -Install New Two Way Clean Out In Front Yard -Replace Section Of Main Drain Underneath Home. Will Pull Back White Rock And Excavate Front Yard In Order To Install Two Way Clean Out. Also Will Change Section Of Main Drain Front Underneath Home To Outside House Foundation. Will Replace Pipe With New A
  • 2023
    permit on file, unconfirmedSolar: 1.62 Kw Dc Pv, 13.5 Kwh Ess (4) Hanwha Q. Peak Duo Blk Ml-G10+ 405 Solar Module (1) Tesla Inc. - 7.6 Inverter 1538000-Xx-Y Inverter (1) 10 Feet New Softscape Trench (1) The Main Breaker Derated
  • 2023
    permit on file, unconfirmedElectrical: Installation Of (1) 7.6Kw Tesla Battery, Solr230830004708
  • 2023
    permit on fileSolar: 2.43 Kw Dc Pv, 13.5 Kwh Ess. Main Solr230830004708 (4) Hanwha Q. Peak Duo Blk Ml-G10+ 405 Solar Module (1) Tesla Inc. - 7.6 Inverter 1538000-Xx-Y Inverter (1) 10 Feet New Softscape Trench (1) The Main Breaker Derated
  • 2019
    permit on file, unconfirmedPlumbing: Install Water Softener

Manage this home to schedule a service or to update the timeline.