LAHomework Sign in
La Crescenta, CA 91214 · Vicwood Ave

4930 Vicwood Ave

Built 1952 · 1,443 sq ft
LOT 7,616 SQ FT · 2 STRUCTURES · APN 5803-022-012Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1952
Living area
1,443 sqft
Lot size
7,616 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5803-022-012

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 21 homes on Vicwood Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on filePlumbing: Plumbing For Bathroom Remodel - Bldr250818010330
  • 2025
    permit on fileBathrooms: Remodel One Bathroom With Fixture Replacements; No Structural Or Layout Changes
  • 2024
    permit on fileKitchen: Kitchen Remodel - Remove Carpeting In The Living Room And Replace With Hardwood. Remove Existing Kitchen/Laundry Cabinets And Replace With New Cabinets.
  • 2024
    permit on fileElectrical: Electrical For Kitchen Remodel - Between Three Different Rooms A Total Of 14 Led Lights Will Be Added To The Ceilings. An Led Light Strip Will Be Added To The Underside Of The Cabinets
  • 2024
    permit on filePlumbing: Plumbing For Kitchen Remodel - Replacing The Existing Galvanized Supply Lines With Copper. Replacing The Existing Galvanized Waste Lines With The Same Size But In Abs. The Main Line Will Not Be Replaced For Either The Supply Or Waste Lines, Only The Branches That Connect The Kitchen And Laundry Room
  • 2024
    permit on fileHeating & cooling: Mechanical For Kitchen Remodel - Replace Existing Kitchen Hood, Use Existing Vents.

Manage this home to schedule a service or to update the timeline.