LAHomework Sign in
Temple City, CA 91780 · Rio Hondo Ave

4910 Rio Hondo Ave

Built 1951 · 2,061 sq ft
LOT 6,492 SQ FT · 1 STRUCTURE · APN 8590-025-028Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1951
Living area
2,061 sqft
Lot size
6,492 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
8590-025-028

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2010
Expected 2030 to 2040From the 2010 permit
20262035
HVACOn record 2010
Expected 2025 to 2030From the 2010 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 59 homes on Rio Hondo Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2015
    permit on fileSolar: 2.86 Kw (11) Panel Pv System No Main Panel Upgrade
  • 2012
    permit on filePlumbing: Replace Shower Pan, Lavatorie And Water Closet For Bathroom Remodel
  • 2012
    permit on fileElectrical: Re-Wire 22 Outlets And 15 Light Fixtures
  • 2012
    permit on fileBathrooms: Change 6 Windows, Remove The Drywall And Place New, Put Insulation Inside The Wall On Existing Bedrooms, Living Roomand Remodel One Bathroom
  • 2010
    permit on fileRoof: Tear Off And Reroof With Composition Shingle To Match New Addition
  • 2010
    permit on fileHeating & cooling: Alteration Of Exist Duct System, 6 Air Inlets And 3 Ventilation Fans
  • 2010
    permit on fileElectrical: Electrical For New Addition, Upgrade Service Panel To 200 Amp And Sub-Panel 100 Amp
  • 2010
    permit on fileRoom addition: Add: Master Bedrm, 2.5 Bathrms, 1 Closet, Laundry Rm, Familyrm, Kitchen And Dining Rm.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementExpected 2025 to 2030
  • 2030
    Roof replacementExpected 2030 to 2040