LAHomework Sign in
Woodland Hills, CA 91364 · Azucena Dr

4901 Azucena Dr

Built 2006 · 5,371 sq ft
LOT 67,720 SQ FT · 2 STRUCTURES · APN 2076-006-069Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2006
Living area
5,371 sqft
Lot size
1.55 acres
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
6
Home type
Single-family
Parcel (APN)
2076-006-069

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2026 to 2036From build year 2006
20262035
HVACWorth a look now
Expected 2021 to 2026From build year 2006
20262035
Water heaterWorth a look now
Usually done by 2021From build year 2006

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 18 homes on Azucena Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedRoom addition: Convert Existing Garage To A Detached Accessory Dwelling Unit Per Gc 66323(A)(1). Nfpa 13D Fire Sprinkler System Is Required
  • 2019
    permit on fileElectrical: Electrical Permit · MNAYAN VARTAN ELECTRICAL CONTRACTOR
  • 2017
    permit on file, unconfirmedSolar: Pv1. Install A 7.8 Kw Pv Ground-Mounted, Grid-Tied Pv System. (1) 7. · TAHMASBI FEREIDOUN

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2021
  • Now
    HVAC replacementExpected 2021 to 2026
  • Now
    Roof replacementExpected 2026 to 2036