LAHomework Sign in
Pasadena, CA 91105 · S Orange Grove Blvd

480 S Orange Grove Blvd Unit 21

Built 1972 · 2,308 sq ft
SHARED CONDO LOT · APN 5713-036-066Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1972
Living area
2,308 sqft
Lot
Shared (condo complex)
Bedrooms
2
Bathrooms
3
Home type
Condo / townhome
Parcel (APN)
5713-036-066

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 1993
Usually done by 2023From the 1993 permit
HVACOn record 2010
Expected 2025 to 2030From the 2010 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 722 homes on S Orange Grove Blvd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2010
    permit on fileHeating & cooling: Replace Furnace For Residential Remodel
  • 2010
    permit on fileElectrical: Electrical Fixtures & Appliances For Interior Remodel
  • 2010
    permit on filePlumbing: Plumbing Fixtures & Drain For Residential Remodel
  • 2010
    permit on fileKitchen: Residential Interior Remodel Of Condominium Kitchen Bathrooms & Replace Flooring
  • 2008
    permit on filePlumbing: Cooper Re-Piping Existing Fixtures
  • 1993
    permit on fileRoof: Rf - Re-Roof Condo Bldg W/ Built-Up Mat(Ul #6529-C B Or Better)

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2023
  • Now
    HVAC replacementExpected 2025 to 2030