LAHomework Sign in
Los Angeles, CA 90032 · Templeton St

4760 Templeton St Unit 3116

Built 1995 · 599 sq ft
SHARED CONDO LOT · APN 5213-032-183Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1995
Living area
599 sqft
Lot
Shared (condo complex)
Bedrooms
1
Bathrooms
1
Home type
Condo / townhome
Parcel (APN)
5213-032-183

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Usually done by 2025From build year 1995
HVACOn record 2026
Expected 2041 to 2046From the 2026 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileBathrooms: Bathroom (1 ) Remodel For Residential Buildings (No Structural Changes).
  • 2026
    permit on file, unconfirmedBathrooms: Bathroom Remodel For Residential Buildings (No Structural Changes)
  • 2026
    permit on file, unconfirmedGeneral remodel: Water Damage, Termite Damage/ Dry Rot Repair Less Than 10% Of Replacement Cost Of Residential Buildings.
  • 2026
    permit on fileElectrical: Total Of (7) Lights, Outlets, And Switches For 1 Bathroom.
  • 2026
    permit on file, unconfirmedElectrical: Outlet
  • 2026
    permit on fileElectrical: Rewiring Or Adding Devices To Existing Electrical Circuits For Receptacles, Telephone And Communication Outlets. Upgrade To Current Ca Code. Includes Exhaust Fan
  • 2026
    permit on filePlumbing: Inspection Of New Installation Sgsov For Point Of Sale
  • 2026
    permit on filePlumbing: Replace And Install New Fixtures For 1 Bathroom Remodel.
  • 2026
    permit on fileHeating & cooling: (1) Bathroon Fan
  • 2026
    permit on filePlumbing: Relocate Kitchen Sink, Dishwasher And Disposal
  • 2026
    permit on filePlumbing: Replacing Plumbing Fixtures.
  • 2026
    permit on fileHeating & cooling: Exhaust Fan For Bathroom Remodel
  • 2026
    permit on filePlumbing: New Installation Sgsov For Point Of Sale
  • 2025
    permit on fileElectrical: Recess Lighting
  • 2025
    permit on fileElectrical: Outlets
  • 2025
    permit on filePlumbing: Inspection Of Existing Sgsov For Point Of Sale
  • 2025
    permit on filePlumbing: Sink Replacement
  • 2025
    permit on fileHeating & cooling: Bathroom Exhaust Fans
  • 2025
    permit on filePlumbing: Bathroom Toilet Replacement
  • 2025
    permit on filePlumbing: Gas
  • 2024
    permit on file, unconfirmedKitchen: (1) Kitchen Remodel For Residential Buildings (No Structural Changes).
  • 2024
    permit on fileElectrical: Reconnect To Existing Electrical Supply.Provide And Install New Gfi (For Replacement Of Heating And Cooling System)
  • 2024
    permit on fileElectrical: Kitchen Remodel Like To Like No Strutural Changesreplace 6 Gfi Adding 4 Recessed Light, 3 Switches
  • 2024
    permit on fileElectrical: New Disconnect
  • 2024
    permit on filePlumbing: Installation Of (1) Sgsov For Home Sale
  • 2024
    permit on fileHeating & cooling: Replacing A Heating And Cooling System
  • 2024
    permit on fileHeating & cooling: Kitchen Remodel Like To Like No Strutural Changes (1) Kitchen Hood
  • 2024
    permit on filePlumbing: Inspection Of (1) Existing Sgsov For Home Sale
  • 2024
    permit on filePlumbing: Kitchen Remodel Like To Like No Strutural Changesreplace 1 Kitchen Sink, 1 Kitchen Dish Washer, 1 Kitchen Gd
  • 2024
    permit on file, unconfirmedHeating & cooling: Heat Pump Split System Soffit Mount Changeout
  • 2024
    permit on fileHeating & cooling: Air Handler & Condenser Changeout
  • 2023
    permit on fileElectrical: Installation Of Heating And Cooling System
  • 2023
    permit on file, unconfirmedHeating & cooling: Installing 1.5 Central Hp
  • 2023
    permit on file, unconfirmedHeating & cooling: Replace 2.5-Ton Heat Pump - Roof
  • 2023
    permit on file, unconfirmedHeating & cooling: Replacing Rooftop Heat Pump Condenser And Attic Air Handler In The Same Locations.
  • 2023
    permit on fileHeating & cooling: Installation Of Heating And Cooling System
  • 2022
    permit on fileBathrooms: (1) Bathroom Remodel For Residential Buildings (No Structural Changes).
  • 2022
    permit on fileElectrical: Installation Of 100A Ev Panel And (4) 48A Evse.
  • 2022
    permit on file, unconfirmedElectrical: Installation Of 200A Ev Panel And 4 48A Evse
  • 2022
    permit on fileElectrical: Installation Of 100A Ev Panel & (3) 48A Evse.
  • 2022
    permit on fileElectrical: 2 Lights 1 Gfi 2 Switches
  • 2022
    permit on fileHeating & cooling: Fan
  • 2022
    permit on filePlumbing: Replace Tub With Shower Sink Toilet
  • 2022
    permit on file, unconfirmedPlumbing: Inspection Of (1) Existing Sgsov For Point Of Sale
  • 2022
    permit on filePlumbing: Installed One Sesmic Gas Shut Off Valve For Unit #1326
  • 2021
    permit on fileGeneral remodel: Repair Balcony/ Deck And Guardrail Per Engineer Plans
  • 2021
    permit on fileGeneral remodel: Repair Balcony/Deck And Guardrail Per Engineer Plans Unit #1209, 1212, 1216 & 1312
  • 2021
    permit on fileGeneral remodel: Repair Balcony/ Deck And Guardrail Per Engineer Plans
  • 2021
    permit on fileElectrical: Installation Of 200A Ev Panel + 10 Evse
  • 2021
    permit on file, unconfirmedElectrical: Installation Of 200A Ev Panel And 3 Evse.
  • 2021
    permit on fileElectrical: Installation Of 2 Evse
  • 2021
    permit on filePlumbing: Earthquake Valve Install
  • 2021
    permit on file, unconfirmedHeating & cooling: Replacing 2.5 Ton Heat Pump Condenser And Air Handler Like For Like Same Place Location
  • 2021
    permit on filePlumbing: Installed One Seismic Gas Shut Off Valve For Unit #1312
  • 2021
    permit on file, unconfirmedPlumbing: Inspect Existing Sgsov
  • 2021
    permit on filePlumbing: Inspection Of (1) Sgsov For Point Of Sale
  • 2020
    permit on file, unconfirmedElectrical: Installation Of Three 200A Ev Panels And Installaton Of 14 Evse
  • 2020
    permit on filePlumbing: Installation Of (1) Sgsov For Home Sale
  • 2020
    permit on file, unconfirmedHeating & cooling: Replacing 2.5 Ton Condenser And Air Handler Like For Like Same Place Location
  • 2020
    permit on filePlumbing: Installation Of (1) Sgsov For Home Sale

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2025