LAHomework Sign in
Woodland Hills, CA 91364

4719 San Sebastian Drive

Built 2008 · 3,428 sq ft
LOT 23,234 SQ FT · 1 STRUCTURE · APN 2076-011-023Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2008
Living area
3,428 sqft
Lot size
23,234 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
2076-011-023

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2024
Expected 2044 to 2054From the 2024 permit
HVACWorth a look now
Expected 2023 to 2028From build year 2008
20262035
Water heaterWorth a look now
Usually done by 2023From build year 2008

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 24 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2018
    permit on filePlumbing: Plumbing Permit · HENRIK PLUMBING INC
  • 2014
    permit on fileSolar: Pv1: 5Kw Roof-Mounted System With (20) Trina Solar Tsm-255 Modules, (2 · SOLARCITY CORPORATION

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2023
  • Now
    HVAC replacementExpected 2023 to 2028