LAHomework Sign in
Los Angeles, CA 91356 · Ellenita Ave

4657 Ellenita Ave

Built 1965 · 3,711 sq ft
LOT 37,969 SQ FT · 1 STRUCTURE · APN 2178-012-030Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1965
Living area
3,711 sqft
Lot size
37,969 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
2178-012-030

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 124 homes on Ellenita Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileSolar: Installation Of Roof-Mounted Microinverter/Ac Module Solar Pv System, Notexceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling.
  • 2021
    permit on file, unconfirmedRoom addition: Addition To (E) Single Family Dwelling To Add 26' X 23' Accessory Dwelling Unit Per Lamc 12.22 A.33(C) And (E) On 2Nd Story Over (E) Garage.
  • 2020
    permit on file, unconfirmedGeneral remodel: Complete Work Done Under Previously Expired Permit #12014-20000-03541_ Work Is __80____% Complete (Minimum 75% Percent Completed As Determined By Inspection).
  • 2016
    permit on file, unconfirmedGeneral remodel: Supplement To Permit 12014-20000-03541 To "Delete Fire Sprinklered T · OWNER-BUILDER
  • 2014
    permit on file, unconfirmedRoom addition: To Add To A Single Story Sfd. Fire Sprinklered Throughout. · OWNER-BUILDER

Manage this home to schedule a service or to update the timeline.