LAHomework Sign in
Los Angeles, CA 90022 · S Ford Blvd

465 S Ford Blvd

Built 2020 · 2,632 sq ft
LOT 7,213 SQ FT · APN 5247-004-056Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2020
Living area
2,632 sqft
Lot size
7,213 sqft
Bedrooms
8
Bathrooms
6
Home type
Duplex (2 units)
Parcel (APN)
5247-004-056

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterComing up
Expected 2030 to 2035From build year 2020
20262035
See 1 more system expected later
RoofLater
Expected 2040 to 2050Original, built 2020

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 114 homes on S Ford Blvd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: 400 Amp 3 Gang Meter To Service 463,465, & 463 1/2 S Ford Blvd
  • 2024
    permit on fileSolar: Roof Mounted Solar Photovoltaic Array Residential Photovoltaic System 2.4 Kw Dc Installation Of: 6 Solar Modules @ 400 Watts Ea. 6 Enphase Micro Inverters
  • 2023
    permit on fileSolar: Electrical For A Construction Of New Detached Accessory Dwelling Unit (Adu) (733 Sf) Consisting Of Two Bedroom, One Bathroom, Kitchen, Living Room, Laundry. Deferred Submittal Pv System For Adu
  • 2023
    permit on fileHeating & cooling: Mechanical For A Construction Of New Detached Accessory Dwelling Unit (Adu) (733 Sf) Consisting Of Two Bedroom, One Bathroom, Kitchen, Living Room, Laundry. Deferred Submittal Pv System For Adu
  • 2023
    permit on filePlumbing: Plumbing For A Construction Of New Detached Accessory Dwelling Unit (Adu) (733 Sf) Consisting Of Two Bedroom, One Bathroom, Kitchen, Living Room, Laundry. Deferred Submittal Pv System For Adu
  • 2023
    permit on filePlumbing: Sewer For A Construction Of New Detached Accessory Dwelling Unit (Adu) (733 Sf) Consisting Of Two Bedroom, One Bathroom, Kitchen, Living Room, Laundry. Deferred Submittal Pv System For Adu
  • 2020
    permit on filePlumbing: Miscellaneous Fixture Earthquake Gas Shut Off Valve
  • 2019
    permit on filePlumbing: Sewer Connection For New 2632 2-Story Duplex With (2) Attached (1) Car Garages. Each Unit Will Be 1316Sf With 4-Bedrooms, 3-Bathrooms, Laundry Room, 1-Walk In Closet, Living Room & Kitchen. With 84Sf Front Porch And 21Sf Side Porch
  • 2019
    permit on filePlumbing: Plumbing For New 2632 2-Story Duplex With (2) Attached (1) Car Garages. Each Unit Will Be 1316Sf With 4-Bedrooms, 3-Bathrooms, Laundry Room, 1-Walk In Closet, Living Room & Kitchen. With 84Sf Front Porch And 21Sf Side Porch
  • 2019
    permit on fileHeating & cooling: Mechanical For New 2632 2-Story Duplex With (2) Attached (1) Car Garages. Each Unit Will Be 1316Sf With 4-Bedrooms, 3-Bathrooms, Laundry Room, 1-Walk In Closet, Living Room & Kitchen. With 84Sf Front Porch And 21Sf Side Porch

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2030
    Water heater replacementExpected 2030 to 2035