LAHomework Sign in
Los Angeles, CA 90065 · Nob Hill Dr

4645 Nob Hill Dr

Built 1978 · 1,491 sq ft
LOT 6,245 SQ FT · 1 STRUCTURE · APN 5475-020-002Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1978
Living area
1,491 sqft
Lot size
6,245 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5475-020-002

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 59 homes on Nob Hill Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedRoom addition: Convert Existing Crawlspace Into New Habitable Space
  • 2023
    permit on file, unconfirmedElectrical: Install An Electrical Vehicle Charger(S) In A Single-Family Dwelling.
  • 2020
    permit on fileGeneral remodel: Add Sill Plate Anchors Bolts And Cripple Wall Plywood Per L.A. City Std. Plan #1; No Foundation Replacement (Eq Hazard Reduction Per Chapter 92).
  • 2020
    permit on filePlumbing: Installation Of (1) Sgsov For Home Sale

Manage this home to schedule a service or to update the timeline.