LAHomework Sign in
Los Angeles, CA 91403 · Halbrent Ave

4641 Halbrent Ave

Built 2004 · 3,350 sq ft
LOT 7,119 SQ FT · 1 STRUCTURE · APN 2264-004-041Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2004
Living area
3,350 sqft
Lot size
7,119 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
4
Home type
Single-family
Parcel (APN)
2264-004-041

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2024 to 2034From build year 2004
20262035
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 33 homes on Halbrent Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileSolar: Installation Of A Roof-Mounted Microinverter/Ac Module Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2025
    permit on fileHeating & cooling: Change Out Hvac Downstairs Only With Electric Heat Pump, Like For Like
  • 2022
    permit on fileHeating & cooling: Remove Existing System From Home.Hang New Air Handler, Coil And Plenumsin Attic Using Unit-Strut And Threadedrod. Set New Condenser On Side Ofhome (Unit Will Be Moved Away Fromsecond Condenser). Modify And Hook Uprefrigerant And Electrical Lines. Connectexisting Ducting To New Unit. Install Newtherm

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2024 to 2034