LAHomework Sign in
El Monte, CA 91732 · Durfee Ave

4625 Durfee Ave

Built 1975 · 1,300 sq ft
LOT 7,812 SQ FT · 1 STRUCTURE · APN 8545-026-028Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1975
Living area
1,300 sqft
Lot size
7,812 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
8545-026-028

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2015
Expected 2025 to 2030From the 2015 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 292 homes on Durfee Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2017
    permit on fileRoom addition: Re: Legalize Remodel 4 Bedrooms And 2 Baths, Legalize 5 Window And 2 Sliding Door Change Outs, Install New Drywall At Celling And Walls In Garage (Garage To Remain Non-Inhabitable), Renew Permit For Kitchen Remodel, Walk In Tub Installation, Upgrad Panel To 200 Amp (B00-015-883), Extend Roof Eaves O
  • 2015
    permit on fileWater heater: Replace 40 Gallon Water Heater Same Location
  • 2014
    permit on fileRoom addition: Remove Non Bearing Partition Wall In Kitchen
  • 2014
    permit on fileRoom addition: Remodel Bath To Inc.Plmb, Elec Outlet And Wall Around Shower

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementExpected 2025 to 2030