LAHomework Sign in
Los Angeles, CA 90008 · Don Milagro Dr

4532 Don Milagro Dr

Built 1959 · 2,279 sq ft
LOT 6,329 SQ FT · 1 STRUCTURE · APN 5028-016-007Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1959
Living area
2,279 sqft
Lot size
6,329 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
5028-016-007

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2021
Expected 2036 to 2041From the 2021 permit
Water heaterOn record 2022
Expected 2032 to 2037From the 2022 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 58 homes on Don Milagro Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: Electrical Panel Upgrade
  • 2024
    permit on fileElectrical: Install An Ev For Car Charging.
  • 2024
    permit on fileSolar: Installation Of A Roof-Mounted Microinverter/Ac Module Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2022
    permit on fileGeneral remodel: Remove The (E) Windows And Replace Them With A Multi Folding Door And Header Change Out At Family Room And Dining Room., All Work Per Engineering"Comply With Department Order Effective Date08/25/2021. Permit Will Expire 30 Days From Issuance Date".
  • 2022
    permit on fileWater heater: Replace Existing Water Heater
  • 2021
    permit on fileGeneral remodel: Re-Stucco For Residential Buildings. "Comply With Department Order Effective Date08/25/2021. Permit Will Expire 30 Days From Issuance Date".
  • 2021
    permit on fileGeneral remodel: 9 Window And 5 Door Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buildings, Three Stories Or Less, Per Section 150.2(B) 1B Of Title 24. "Compl
  • 2021
    permit on fileElectrical: Replace Existing Receptacles And Switches. Replace Existing Fixtures/Chandeliers With Retrofit Led Lights In Living Area And Kitchen, And Replace Ceiling Fans In All Rooms. Run (5) Circuits In Kitchen. "Comply With Department Order Effective Date08/25/2021. Permit Will Expire 30 Days From Issuance D
  • 2021
    permit on file, unconfirmedPlumbing: Electrical Fixtures For Remodel. "Comply With Department Order Effective Date08/25/2021. Permit Will Expire 30 Days From Issuance Date"
  • 2021
    permit on fileHeating & cooling: Replace Old Existing Hvac System And Ducts. Replace Old Existing Bathroom Vents And Torn Ducting. "Comply With Department Order Effective Date08/25/2021. Permit Will Expire 30 Days From Issuance Date"

Manage this home to schedule a service or to update the timeline.