LAHomework Sign in
Los Angeles, CA 90011 · Wall St

4518 Wall St

Built 1911 · 1,204 sq ft
LOT 6,969 SQ FT · 2 STRUCTURES · APN 5109-011-018Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1911
Living area
1,204 sqft
Lot size
6,969 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5109-011-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 189 homes on Wall St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedElectrical: Run 60Ft Long Of Underground Conduit With Wires To Feed The Adu Subpanel From The Main Meter Panel Box.
  • 2025
    permit on file, unconfirmedElectrical: One Eletric Service 200 Amps Rewire 15 Brans Circuits Install Electrical Sub Panel 100 Amps
  • 2025
    permit on file, unconfirmedElectrical: Replace Raiser And Wires At Existing Electrical Panel
  • 2025
    permit on file, unconfirmedPlumbing: 1-Run 120 Ft Long Of New Underground Sewer Drain 4''Dia With Two Clean Outs From The Adu To The Existing Main House Sewer.2-Rrun 90Ft Long Of 1 Inch Underground Gas Line From The Main Gas Meter To The Proposed Adu3-Run 120Ft Long Of 1Inch Water Supply Line From The Main House Line To The Proposed Ad
  • 2025
    permit on file, unconfirmedPlumbing: Replace A Hose Bib Vacuum Breaker

Manage this home to schedule a service or to update the timeline.