LAHomework Sign in
Los Angeles, CA 91356 · Vanalden Ave

4514 Vanalden Ave

Built 1997 · 3,997 sq ft
LOT 31,075 SQ FT · 3 STRUCTURES · APN 2177-003-022Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1997
Living area
3,997 sqft
Lot size
31,075 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
5
Home type
Single-family
Parcel (APN)
2177-003-022

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2017 to 2027From build year 1997
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 206 homes on Vanalden Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedGeneral remodel: 1 Door(S). Window And Door Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buildings, Three Stories Or Less, Per Title 24, Part 6, Section 150.2(
  • 2024
    permit on file, unconfirmedGeneral remodel: 45 Window(S). Window And Door Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buildings, Three Stories Or Less, Per Title 24, Part 6, Section 150
  • 2023
    permit on fileElectrical: 100 Linear Feet For A Future Electrical Outlet.
  • 2023
    permit on filePlumbing: 1-1/2" Shut-Off Valve & 200 Linear Feet Of Gasline.
  • 2021
    permit on filePool: Remodel (E) Pool - Add New Spa W/ 9'-4" Diameter, Baja, And Table Top Per Standard Plan #268
  • 2021
    permit on fileElectrical: Install 3 New Outlets
  • 2021
    permit on filePlumbing: New Gas Outlets

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2017 to 2027