LAHomework Sign in
Palmdale, CA 93551 · Camino Real Ave

450 Camino Real Ave

Built 1987 · 2,309 sq ft
LOT 7,994 SQ FT · 1 STRUCTURE · APN 3004-026-079Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1987
Living area
2,309 sqft
Lot size
7,994 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
3
Home type
Single-family
Parcel (APN)
3004-026-079

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2026
Expected 2041 to 2046From the 2026 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 27 homes on Camino Real Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileHeating & cooling: Ductless Minisplit Hp Change Out Like For Like In Same Location, 1.5 Ton, 23.5 Seer, 10.5 Hspf, Heat Pump Backyard, Zone Indoors
  • 2026
    permit on file, unconfirmedSolar: Install A 9.48 Kw Dc Roof-Mounted Solar Pv System Consisting Of 24 Mission Solar Energy Mse395Sx9R 395W Modules, Integrated With One Tesla Powerwall 3, 13.5 Kwh Battery Energy Storage System.
  • 2025
    permit on fileElectrical: 450 Camino Real // Mpu 200 Am And Install 40A 14-50 Outlet Inside Garage 450 Camino Real // Mpu 200 Am And Install 40A 14-50 Outlet Inside Garage
  • 2024
    permit on file, unconfirmedHeating & cooling: Hvac- 5 Ton Heat Pump Split System Replacement. Same Location. E#11340338

Manage this home to schedule a service or to update the timeline.