LAHomework Sign in
Los Angeles, CA 90042 · Via Marisol

4499 Via Marisol Unit 143c

Built 1981 · 1,261 sq ft
SHARED CONDO LOT · APN 5301-018-221Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1981
Living area
1,261 sqft
Lot
Shared (condo complex)
Bedrooms
2
Bathrooms
2
Home type
Condo / townhome
Parcel (APN)
5301-018-221

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2024
Expected 2044 to 2054From the 2024 permit
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterOn record 2020
Expected 2030 to 2035From the 2020 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileKitchen: Replace Drywall & Insulation Through-Out, (2) Bathroom Remodel, (1) Kitchen Remodel, See Comments For Details
  • 2026
    permit on fileElectrical: Replace Sub Panel
  • 2026
    permit on file, unconfirmedElectrical: Subpanel
  • 2026
    permit on file, unconfirmedElectrical: Replace Sub Panel
  • 2026
    permit on fileElectrical: Install Recessed Lights And Wall Sconces In Bathroom Replace Exhaust Fans
  • 2026
    permit on fileElectrical: Tenant Panel Replacement
  • 2026
    permit on file, unconfirmedElectrical: Replace Sub Panel
  • 2026
    permit on file, unconfirmedElectrical: Replace Sub Panel
  • 2026
    permit on fileElectrical: Panel Upgrade
  • 2026
    permit on fileElectrical: Tenant Panel Replacement
  • 2026
    permit on fileElectrical: Sub Panel Replace
  • 2026
    permit on fileElectrical: Panel Replacement
  • 2026
    permit on fileElectrical: Tenant Panel Replacement
  • 2026
    permit on fileElectrical: Replace Sub Panel
  • 2026
    permit on file, unconfirmedElectrical: Replacement Of 2 Ea Load Center Panels. These Panels Are The House Panels In The Parking Garage Area That Control The Building And Property Lighting And Other Necessary Property Electrical. 2Ea 225A Subpanels
  • 2026
    permit on file, unconfirmedElectrical: Replace Sub Panel
  • 2026
    permit on file, unconfirmedElectrical: *Total Load Connect Not To Exceed 400Amps* Replacement Of 5Ea Load Center Panels. These Panels Are The House Panels In The Parking Garage Area That Control The Building And Property Lighting And Other Necessary Property Electrical. 1Ea 200A & 4Ea 225A Panels
  • 2026
    permit on fileElectrical: Replace Sub Panel In Same Location
  • 2026
    permit on file, unconfirmedElectrical: Replace Sub Panel
  • 2026
    permit on file, unconfirmedElectrical: Panel Upgrade
  • 2026
    permit on fileElectrical: Sub-Panel Replacement - Removing Old Style Stablok Type Panel Due To Insurance Requirements. This Panel Shall Be A 100 Or 125A Rated Panel For Spacing Requirements With New Breakers.
  • 2026
    permit on fileElectrical: Replace Sub Panel
  • 2026
    permit on file, unconfirmedElectrical: Replace Sub Panel
  • 2026
    permit on fileElectrical: Replace Sub Panel
  • 2026
    permit on fileElectrical: Replace Sub Panel
  • 2026
    permit on fileElectrical: Replace Sub Panel
  • 2026
    permit on file, unconfirmedElectrical: Replace Sub Panel
  • 2026
    permit on fileElectrical: Replace Panel
  • 2026
    permit on fileElectrical: Replace Sub Panel
  • 2026
    permit on fileElectrical: Panel Upgrade
  • 2026
    permit on fileElectrical: Tennant Panel Replacement
  • 2026
    permit on file, unconfirmedElectrical: Replace 3Ea Small Load Center Panels In Laundry Rooms. (1Ea Panel For 3Ea Laundry Rooms)
  • 2026
    permit on file, unconfirmedElectrical: Replace Sub Panel
  • 2026
    permit on fileElectrical: Replace Sub Panel
  • 2026
    permit on fileElectrical: Replace Sub Panel
  • 2026
    permit on fileElectrical: Need To Replace The Existing Sub Panel With A New One
  • 2026
    permit on fileElectrical: Replace Sub Panel
  • 2026
    permit on fileElectrical: Replace Sub Panel
  • 2026
    permit on filePlumbing: Install Shower Valve With Ten Feet Of Half Inch Copper Water Lines In 2 Bathrooms.
  • 2026
    permit on file, unconfirmedPlumbing: Replacing A Dishwasher
  • 2026
    permit on file, unconfirmedPlumbing: Fixture Replacement
  • 2026
    permit on file, unconfirmedPlumbing: Replacing A Dishwasher
  • 2026
    permit on file, unconfirmedHeating & cooling: Hvac Replacement
  • 2025
    permit on fileElectrical: Run Dedicated 220V To Panel
  • 2025
    permit on fileElectrical: Replace A Sub-Panel In Unit And Install 10 Flushmounts.
  • 2025
    permit on fileElectrical: Install 4 Light Fixtures
  • 2025
    permit on file, unconfirmedElectrical: Take Out Old Electric Heater And Repalce Woth New Heater
  • 2025
    permit on file, unconfirmedElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Add Branchline
  • 2025
    permit on fileElectrical: Adding 35 Lights In A Existing Circuits For Room Offices. Existing Circuits For Lighting Are 3 Now And We Use The Same Switches For New Lights
  • 2025
    permit on fileElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Tenant Panel Replacement
  • 2025
    permit on fileElectrical: Sub Panel Replacement
  • 2025
    permit on file, unconfirmedElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Replace Old Sub Panel
  • 2025
    permit on fileElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Tenant Panel Replacement
  • 2025
    permit on fileElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Tenant Panel Replacement
  • 2025
    permit on file, unconfirmedElectrical: Replace Sub Panel
  • 2025
    permit on file, unconfirmedElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Tenant Panel Replacement
  • 2025
    permit on file, unconfirmedElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Replace Tenant Panel
  • 2025
    permit on fileElectrical: Tenant Panel Replacement
  • 2025
    permit on fileElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Tenant Panel Replacement
  • 2025
    permit on file, unconfirmedElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Panel Replacement
  • 2025
    permit on fileElectrical: Replace Electrical Sub Panel
  • 2025
    permit on fileElectrical: Upgrade The Electrical Panel.
  • 2025
    permit on file, unconfirmedElectrical: Replace Cub Panel
  • 2025
    permit on file, unconfirmedElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Replace Sub Panel
  • 2025
    permit on file, unconfirmedElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Upgrade A 100Amp Load Center
  • 2025
    permit on fileElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Replace Sub Panel
  • 2025
    permit on fileElectrical: Install A 100Amp Sub Panel
  • 2025
    permit on fileHeating & cooling: One Condenser And Air Handler Change Out
  • 2025
    permit on file, unconfirmedHeating & cooling: Pre Existing Condenser Replacement
  • 2025
    permit on file, unconfirmedHeating & cooling: Like For Like Change Out Heat Pump, Coil, And Air Handler
  • 2025
    permit on fileHeating & cooling: 2 Ton Heat Pump Condenser And Coil Changeout
  • 2025
    permit on filePlumbing: Replace Kitchen Sink
  • 2025
    permit on fileHeating & cooling: Like For Like Change Out 2 Ton Trane Split Heat Pump Condenser
  • 2025
    permit on fileHeating & cooling: Install A Heat Pump And Air Handler With Ducts
  • 2025
    permit on filePlumbing: Replacing A Dishwasher
  • 2024
    permit on fileBathrooms: (2) Bathroom Remodel For Residential Buildings (No Structural Changes)
  • 2024
    permit on fileRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing __900__Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Label
  • 2024
    permit on fileRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing __900__Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Label
  • 2024
    permit on fileElectrical: Interior Remodel For 2 Bathrooms Like For Like, Changing One Recesses Light In The Hallway
  • 2024
    permit on file, unconfirmedElectrical: Shower Area
  • 2024
    permit on fileElectrical: Install 15 X 4" Recessed Lights.
  • 2024
    permit on fileElectrical: Replace Sub Panel
  • 2024
    permit on filePlumbing: Interior Remodel For 2 Bathrooms Like For Like, Replacing One Recessed Light In Hallway
  • 2024
    permit on filePlumbing: Shower Area
  • 2022
    permit on file, unconfirmedElectrical: Installation Of Ceiling Recessed Lights.
  • 2022
    permit on fileElectrical: Permit For Recess Lights
  • 2022
    permit on filePlumbing: Remove And Replace C0Mmon Area Hot Water Equipment With Same In Same Location
  • 2021
    permit on file, unconfirmedElectrical: Install 13 Recessed Lights
  • 2021
    permit on fileElectrical: Recessed Down Light-20Eafan Light-2Ea
  • 2021
    permit on fileElectrical: Install Led Lights,Ceiling Fans And Switches
  • 2020
    permit on fileKitchen: 1 Kitchen Remodel For Residential Buildings (No Structural Changes).
  • 2020
    permit on file, unconfirmedElectrical: Install Total 24 Recessed Ceiling Lights In 4 Rooms In My Condo Unit; 8 Lights, 6 Lights, 6 Lights, 4 Lights;
  • 2020
    permit on file, unconfirmedElectrical: To Install 15 Led Can Lights Where Existing Lighting Was Already Present.
  • 2020
    permit on file, unconfirmedElectrical: Installation Of 13 Level 2 Ev Charging Stations
  • 2020
    permit on fileElectrical: Installation Of 14 Level 2 Ev Charging Stations
  • 2020
    permit on file, unconfirmedElectrical: Installation Of 16 Level 2 Ev Charging Stations
  • 2020
    permit on fileElectrical: Installation Of 15 Level 2 Ev Charging Stations
  • 2020
    permit on fileElectrical: Installation Of 13 Level 2 Ev Charging Stations
  • 2020
    permit on fileElectrical: Total Of 16 Lights, Outlets And Switches
  • 2020
    permit on fileHeating & cooling: Replace One 2.5Ton Air Handler Air Conditioning Unit Inside The Condominium, And One 2.5Ton Heat Pump Condenser Ac Unit On The Roof.
  • 2020
    permit on fileWater heater: Remove And Replace Hot Water Heaters And Equipment.
  • 2020
    permit on filePlumbing: Replace Fixtures
  • 2020
    permit on fileHeating & cooling: Kitchen Hood

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2030
    Water heater replacementExpected 2030 to 2035