LAHomework Sign in
Elizabeth Lk, CA 93532 · Munz Ranch Rd

44320 Munz Ranch Rd

Built 1991 · 3,285 sq ft
LOT 129,333 SQ FT · 1 STRUCTURE · APN 3224-032-035Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1991
Living area
3,285 sqft
Lot size
2.97 acres
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
3224-032-035

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Usually done by 2021From build year 1991
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 7 homes on Munz Ranch Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedElectrical: (Electric For Wind Turbine) Install One Sd3 3.2Kw Wind Turbine And 1 Rectifier Interface And 2 Fimer Uno-Dm-3.3-Tl-Plus-Us-Q (240V) Inverter & Diversion Load Rated Power 3.2Kw Ac And Columbia Hoist Model Hf 3500 On New, Modified Tower Foundation
  • 2020
    permit on fileSolar: Install Advanced Energy System Including: 2 Tesla Powerwall 2 Ac Battery Systems, 1 Tesla Backup Gateway Use Existing Subpanel To Hold Existing Backup Loads And Existing Photovoltaic System. Install New Subpanel To Hold New Ac Battery Circuit Breakers And Existing Backup Loads. Install New Disconnec

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2021