LAHomework Sign in
Los Angeles, CA 91356 · Conchita Way

4432 Conchita Way

Built 1963 · 2,365 sq ft
LOT 19,342 SQ FT · 1 STRUCTURE · APN 2178-030-021Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1963
Living area
2,365 sqft
Lot size
19,342 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
2178-030-021

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 61 homes on Conchita Way →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileGeneral remodel: Replace 1 Door(S). Same Size, Location, Number, Type.
  • 2023
    permit on fileSolar: [Eplan] Pv1 Plan Check For Addition To Existing Roof Mounted Pv System. Addition System Size Is 4.29 Kw Dc/3.8 Kw Ac. Scope Of Work Consists Of (11) Pv Modules With Optimizers And A Inverter
  • 2020
    permit on fileElectrical: Main Panel Upgrade
  • 2020
    permit on fileSolar: [Eplan] New Pv1 Installation 6.83Kwdc (7.6Kwac) Using (21) Qp325 Modules, (21) Sep370 Power Optimizers And (1) Se7600A-Uss2 Central Inverter.Ess (1) Lg Chem Resu 10H (9.8Kwh).Connected To A New 225 Amp Panel. New Panel And New Breaker Are Under Separate Permit.Fees $80.71 Due To California Senate Bi

Manage this home to schedule a service or to update the timeline.