LAHomework Sign in
Beverly Hills, CA 90211 · S La Peer Dr

443 S La Peer Dr

Built 1928 · 1,414 sq ft
LOT 4,772 SQ FT · 2 STRUCTURES · APN 4332-009-010Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1928
Living area
1,414 sqft
Lot size
4,772 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
4332-009-010

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 114 homes on S La Peer Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedRoom addition: New Attached Adu (Eplans Review Under Bs2304622 - Plan Check And Permit Fees Are Collected Under Main Building, Only Issuance Fees)
  • 2026
    permit on file, unconfirmedElectrical: Install Walls Fences And Gates Around The Entire Property. Includes 2 Motorized Gates
  • 2025
    permit on file, unconfirmedRoom addition: (Eplan Bldg) New 2-Story Single Family Residence With An Attached Adu (Separate Permit See Bs2500813)
  • 2025
    permit on file, unconfirmedElectrical: (E-Plan - Elec) New 2-Story Single Family Residence With An Attached Adu.
  • 2025
    permit on file, unconfirmedHeating & cooling: (E-Plan - Mech) New 2-Story Single Family Residence With An Attached Adu
  • 2025
    permit on file, unconfirmedPlumbing: (E-Plan - Plumb) New 2-Story Single Family Residence With An Attached Adu
  • 2025
    permit on file, unconfirmedElectrical: Electrical For New Attached Adu. (E-Plan Review Under Bs2500044)
  • 2025
    permit on file, unconfirmedHeating & cooling: New Attached Adu (E-Plan Review Under Bs2500045)
  • 2025
    permit on file, unconfirmedPlumbing: Plumbing For The Attached Adu (E-Plan Review Under Bs2500046)
  • 2023
    permit on file, unconfirmedElectrical: Temp Power Pole
  • 2023
    permit on file, unconfirmedPlumbing: Sewer Cap

Manage this home to schedule a service or to update the timeline.