LAHomework Sign in
Los Angeles, CA 90011 · E Vernon Ave

443 E Vernon Ave

Built 1905 · 1,312 sq ft
LOT 4,780 SQ FT · 1 STRUCTURE · APN 5113-015-009Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1905
Living area
1,312 sqft
Lot size
4,780 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
5113-015-009

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2022
Expected 2037 to 2042From the 2022 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 135 homes on E Vernon Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on filePlumbing: Floor Drain, Trap Primer, Eq Valves & Backwater Valves
  • 2022
    permit on fileElectrical: [Eplan]Installation Of New Fire Alarm System For 3 Story 13 Unit Multifamily Dwellings. 38 Devices And 1 Facp
  • 2022
    permit on fileElectrical: Piping And Low Voltage Work On 3 Stories Building"Comply With Department Order Effective Date03/23/2021.
  • 2022
    permit on fileHeating & cooling: Install (14) Havc Units, Install Bathroom Exhaust, Install (13) Kitchen Vents. "Comply With Department Order Effective Date03/23/2021. Permit Will Expire 30 Days From Issuance Date".
  • 2021
    permit on file, unconfirmedElectrical: 200 Amp Temporary Power Pole.
  • 2021
    permit on fileElectrical: [Eplan] Full Plan Check For An Electrical System For New Apartment Complex. Scope Of Work Includes New 800Amp, 120/208 V, 3Ph Service, 13 Unit Panels, Lighitng And Circuits. Total Energy Sq. Ft 3094.
  • 2018
    permit on file, unconfirmedPlumbing: Plumbing Permit · OWNER-BUILDER

Manage this home to schedule a service or to update the timeline.