LAHomework Sign in
El Monte, CA 91732 · Fandon Ave

4411 Fandon Ave

Built 1941 · 1,922 sq ft
LOT 14,454 SQ FT · 2 STRUCTURES · APN 8548-001-027Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1941
Living area
1,922 sqft
Lot size
14,454 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
8548-001-027

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2009
Expected 2029 to 2039From the 2009 permit
20262035
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 39 homes on Fandon Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileBathrooms: Bathroom Remodel, Patch Drywall As Needed, Replace Shower, Sink & Water Closet., Replace 2 Lights, 1 Gfci & 3 Switches And Exhaust Fan
  • 2025
    permit on fileHeating & cooling: Replace Condenser , Same Location. Shall Not Be Visible From Public Right Of Way
  • 2019
    permit on fileSolar: Installation Of Roof Mounted Photovoltaic System On (E) Residence. 13 Panels.
  • 2018
    permit on fileElectrical: Eectrical Panel Upgrade 200Amps
  • 2009
    permit on fileRoof: Tear Off And Re-Roof
  • 2009
    permit on fileHeating & cooling: Move Hvac - 4 Ton Unit
  • 2009
    permit on fileRoom addition: Addition Of 556 Sq Ft - Master Bedroom, Bathroom, Interior Hallway-Incl. Elec, Plmbg & Bath Fan (Does Not Include Hvac Relocation)
  • 2006
    permit on fileHeating & cooling: Change Out F.A.U.
  • 2006
    permit on fileElectrical: Adding 220 Voltage To Condenser
  • 2006
    permit on file, unconfirmedHeating & cooling: Wall Furnace Change Out

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2029
    Roof replacementExpected 2029 to 2039