LAHomework Sign in
Pasadena, CA 91106 · N Holliston Ave

439 N Holliston Ave

Built 1922 · 2,579 sq ft
LOT 11,246 SQ FT · 5 STRUCTURES · APN 5739-002-051Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1922
Living area
2,579 sqft
Lot size
11,246 sqft
Structures on lot
5 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
3
Home type
Triplex (3 units)
Parcel (APN)
5739-002-051

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2002
Expected 2022 to 2032From the 2002 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2010
Usually done by 2025From the 2010 permit

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 138 homes on N Holliston Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: Temp Power Pole For : Online New Construction: Construct New 9 Unit Residential Condominium Building (10,570 Sq/Ft) With Attached Garages For Each Unit At 3,137 Sq Ft. (Grading On Bldmf2024-00268)
  • 2025
    permit on file, unconfirmedPlumbing: Plumbing Permit For Online New Construction: Construct New 9 Unit Residential Condominium Building (10,570 Sq/Ft) With Attached Garages For Each Unit At 3,137 Sq Ft. (Grading On Bldmf2024-00268)
  • 2025
    permit on file, unconfirmedElectrical: Electrical Permit For Online New Construction: Construct New 9 Unit Residential Condominium Building (10,570 Sq/Ft) With Attached Garages For Each Unit At 3,137 Sq Ft. (Grading On Bldmf2024-00268)
  • 2025
    permit on file, unconfirmedHeating & cooling: Mechanical Permit For Online New Construction: Construct New 9 Unit Residential Condominium Building (10,570 Sq/Ft) With Attached Garages For Each Unit At 3,137 Sq Ft. (Grading On Bldmf2024-00268)
  • 2025
    permit on filePlumbing: Sewer Caps For 439 N Holliston Ave -Bldmf2022-00267 , 443 N Holliston Ave - Bldmf2022-00277, 441 N Holliston Ave - Bldmf2022-00276
  • 2010
    permit on fileWater heater: Copper Repipe Repair To Water Heater
  • 2009
    permit on fileElectrical: Install & Repair Sub Panels @ 30 Amps Ea (2 Total)
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2003
    permit on fileWater heater: Change Out Water Heater
  • 2002
    permit on fileRoof: Window Change Out - From Double Hung To Slidders (Same Size)

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2025
  • Now
    Roof replacementExpected 2022 to 2032