LAHomework Sign in
Culver City, CA 90230 · Tuller Ave

4367 Tuller Ave

Built 1946 · 1,124 sq ft
LOT 4,913 SQ FT · 2 STRUCTURES · APN 4215-016-016Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1946
Living area
1,124 sqft
Lot size
4,913 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
4215-016-016

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 49 homes on Tuller Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileHeating & cooling: Sfd Remodel And Addition.
  • 2025
    permit on fileSolar: Install (1) Tesla Powerwall Ess And (1) Expansion Unit. Solar On Separate Permit.
  • 2025
    permit on fileSolar: Install 12.71 Kw Roof-Mounted Photovoltaic System (31 Pv Panels). Ess On Separate Permit.
  • 2025
    permit on file, unconfirmedElectrical: Sfd Remodel And Addition.
  • 2025
    permit on filePlumbing: Sfd Remodel And Addition.
  • 2025
    permit on fileElectrical: Temporary Power Pole
  • 2025
    permit on file, unconfirmedRoom addition: Convert Detached Garage To Adu (365 Sf).

Manage this home to schedule a service or to update the timeline.