LAHomework Sign in
Glendale, CA 91214 · Wiley Ln

4230 Wiley Ln

Built 1961 · 1,590 sq ft
LOT 7,686 SQ FT · 1 STRUCTURE · APN 5604-006-006Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1961
Living area
1,590 sqft
Lot size
7,686 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5604-006-006

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2001
Expected 2021 to 2031From the 2001 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 6 homes on Wiley Ln →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileSolar: Solar Roof Mount Installation 8.55 Ac Kw With A Main Panel Upgrade To 200 Amp And Relocation.
  • 2021
    permit on fileElectrical: 200 Amp Service.
  • 2018
    permit on fileGeneral remodel: Changing 7 Windows And 2 Sgd Vinyl Zbar White
  • 2018
    permit on fileKitchen: Remodel Bathroom And Kitchen No Exterior Changes No Movement To Walls Evixtures Same Location No Structures Changes Includes Trades
  • 2001
    permit on fileRoof: Material: Class A 25Yr Comp Shingles (Res.W/Attached Garage) Pitch 4/12 1 Story - No. Of Squares: 31 - Tear Of Existing (Y/N): Y - Existing No. Of Layers: 2 - New Sheathing (Y/N): Y 1/2" Cdx, Ply 8D @ 6", 12" - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2021 to 2031