LAHomework Sign in
Los Angeles, CA 90018 · W Adams Blvd

4220 W Adams Blvd

Built 1925 · 4,248 sq ft
LOT 7,470 SQ FT · 3 STRUCTURES · APN 5051-005-010Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1925
Living area
4,248 sqft
Lot size
7,470 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
4
Home type
Fourplex (4 units)
Parcel (APN)
5051-005-010

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterOn record 2025
Expected 2035 to 2040From the 2025 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 45 homes on W Adams Blvd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: Rewire Units
  • 2025
    permit on file, unconfirmedElectrical: 7 Unit Apartment, Run New Wire For Outlets, Lighting, Smoke Detectors, And Add 7 Sub Panels
  • 2025
    permit on fileElectrical: 2 Adu Units Electrical: Run New Wire For Outlets, Lighting, Smoke Detectors, Add 2 Sub Panels
  • 2025
    permit on file, unconfirmedElectrical: 200Amps Temporary Power Pole
  • 2025
    permit on fileElectrical: Install New Electrical Service At 120/240V, 1, 3W, 600A Overhead To Serve New 5 Unit Building, New 2 Unit Adu Building, And Existing 4 Unit Building. Service Upgrade Only. Tenant Branch Circuiting Not Part Of Scope Of Work. Site Located In Methane Buffer Zone.Note To Plan Checker: This Plan Check Is
  • 2025
    permit on fileSolar: Installation Of A Roof Mounted Pv System For An Adu Unit 1System Size: 2.52Kw-Dc/1.74Kw-Ac6 Modules6 Microinverters
  • 2025
    permit on fileSolar: Installation Of Pv Solar Systemsystem Size:1.84Kw-Dc/1.4Kw-Ac4 Modules4 Microinverters
  • 2025
    permit on fileElectrical: New Lighting For Common Area Of Apartment Building. Total Affected Area Is Approximately 250 Sqft. Plan Check For Energy.
  • 2025
    permit on fileSolar: Installation Of Pv Solar Systemsystem Size:1.84Kw-Dc/1.4Kw-Ac4 Modules4 Microinverters
  • 2025
    permit on fileSolar: Installation Of A Roof Mounted Pv System For An Adu Unit 5System Size: 1.68Kw-Dc/1.16Kw-Ac4 Modules4 Microinverters
  • 2025
    permit on filePlumbing: 5 Units Plumbing; Connecting Air, Run Hot And Col, Run Plumbing, For All Sinks, Toilets Washer And Dryers
  • 2025
    permit on filePlumbing: Dus Units Plumbing; Connecting Air, Run Hot And Cold, Run Plumbing For All Sinks, Toilets, Fridges, Washer And Dryers
  • 2025
    permit on fileHeating & cooling: 2/4 Dusctless Mini Splits
  • 2025
    permit on fileHeating & cooling: Kitchen Exhaust Ventilation And Smoke Detectors For 5 Units
  • 2025
    permit on fileHeating & cooling: Kitchen Exhaust Ventilation & Smoke Detectors For 2 Units
  • 2025
    permit on fileHeating & cooling: Ductless Mini Plits7/16
  • 2025
    permit on fileWater heater: Install 7 Water Heaters And 7 Sub Meters
  • 2024
    permit on fileRoom addition: (2) New 2Nd Story Adus Over Existing 4 Car Garage Per Lamc 12.22 A.33(C)-(D)-Bldg Sprinklerd Thru-Out
  • 2024
    permit on fileElectrical: Rewiring Of All Units 4 New 60 Amp Subpanel 120 Recessed Lights Total Load Not To Exceed 400 Amps
  • 2024
    permit on fileElectrical: E-Plan. Upgrade Existing Electrical Service With New Overhead 120/240V, 1Phase, 3W, 200A. Service Upgrade Only. Tenant Branch Circuiting Not Part Of Scope Of Work.
  • 2024
    permit on filePlumbing: Repiping For 8 Toilets And Showers With Bath Tubs And 8 Vanities
  • 2024
    permit on fileHeating & cooling: Installing 4 Central Furnaces With 4 Condensers
  • 2023
    permit on fileRoom addition: Remodel Both Floors And All Four Units Of (E) Apartment. Remove Exterior Stairs And Create Balconies. Nfpa 13R Thru Out

Manage this home to schedule a service or to update the timeline.