LAHomework Sign in
Glendale, CA 91207 · Cameron Pl

419 Cameron Pl

Built 1924 · 1,618 sq ft
LOT 6,221 SQ FT · 2 STRUCTURES · APN 5644-015-016Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1924
Living area
1,618 sqft
Lot size
6,221 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5644-015-016

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2009
Expected 2029 to 2039From the 2009 permit
20262035
HVACOn record 2007
Expected 2022 to 2027From the 2007 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 34 homes on Cameron Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2010
    permit on fileElectrical: 4 Branch Circuits
  • 2010
    permit on fileGeneral remodel: New 18- X 11- Patio Cover (198 Sf)
  • 2010
    permit on fileElectrical: 1-200 Amp Service
  • 2010
    permit on fileGeneral remodel: Demo Existing Garage 18- X 18-
  • 2010
    permit on fileGeneral remodel: New Detached 2 Car Garage 21- X 21- - This Is A Combination Building//Electrical/ Permit
  • 2010
    permit on fileGeneral remodel: New Detached 2 Car Garage 21- X 21- - - This Is A Combination Building/Mechanical/Electrical/Plumbing Permit
  • 2009
    permit on fileRoof: Commercial Reroof As Follows:- - - Estimated Cost Of Re-Roof:5700 - This Is A Change Of Roofing Material (Y/N):N - Proposed Roofing Material:Class A - Squares (100 Sf) Being Installed:15 - Tear Off Existing (Y/N):Y - Existing Layers Of Roofing:1 - New Sheathing Being Installed (Y/N):N - High Fire Ha
  • 2007
    permit on fileHeating & cooling: 1 Fau And 1 Compressor (Like To Like)
  • 2004
    permit on fileKitchen: Legalization. Combination Permit With Electrical And Plumbing. Bathroom At Rear, 55 S.F. Remodel Drywall, Kitchen, And Bathroom. Replace Windows Throughout. Additional Electrical And Plumbing. (20 Circuits, Repipe 2-Bathrooms, Water Heater And 7 Fixtures). No A/C Work.
  • 2004
    permit on fileRoof: Material: B/U Roof Garage Class A - No. Of Squares: 4 - Tear Off Existing (Y/N): N - Existing No. Of Layers: 1 - New Sheathing (Y/N): N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Shea
  • 2004
    permit on fileRoof: Material: 600 Ib Or Less Tile 10 Sqs; And 6 Sqs B/U Roof House Class A - No. Of Squares: 16 - Tear Off Existing (Y/N): Y - Existing No. Of Layers: 1 - New Sheathing (Y/N): N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementExpected 2022 to 2027
  • 2029
    Roof replacementExpected 2029 to 2039