LAHomework Sign in
Los Angeles, CA 90043 · W 62nd St

4152 W 62nd St

Built 1939 · 1,736 sq ft
LOT 6,571 SQ FT · 1 STRUCTURE · APN 4003-018-002Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1939
Living area
1,736 sqft
Lot size
6,571 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
4003-018-002

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2020
Expected 2040 to 2050From the 2020 permit
HVACOn record 2020
Expected 2035 to 2040From the 2020 permit
20262035
Water heaterOn record 2020
Expected 2030 to 2035From the 2020 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 151 homes on W 62nd St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2020
    permit on fileRoof: (23)Window And (5) Door Change-Out (Same Size & Type) For Residential Buildings.Kitchen And (2)Bathroomremodel Combined With Electrical, Plumbing, And Hvac For Residential Buildings (No Structural Changes).Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over New Solid Shea
  • 2020
    permit on fileKitchen: Alteration To Dwelling To Open Up Wall Between Living Room And Kitchen. Remodel Master Bedroom. "Comply With Department Order Effective Date02/24/2020. Permit Will Expire 30 Days From Issuance Date".
  • 2020
    permit on fileGeneral remodel: Add Sill Plate Anchors Bolts And Cripple Wall Plywood Per L.A. City Std. Plan #1; No Foundation Replacement (Eq Hazard Reduction Per Chapter 92).
  • 2020
    permit on fileElectrical: 200 Amp Panel Upgrade For The House And Rewiring.
  • 2020
    permit on fileWater heater: Water Heater Replacement And Repiping.
  • 2020
    permit on fileHeating & cooling: Replace 4 Ton Hvac System.

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2030
    Water heater replacementExpected 2030 to 2035