LAHomework Sign in
Los Angeles, CA 90062 · S Van Ness Ave

4143 S Van Ness Ave

Built 1914 · 1,355 sq ft
LOT 5,040 SQ FT · 2 STRUCTURES · APN 5022-018-011Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1914
Living area
1,355 sqft
Lot size
5,040 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5022-018-011

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2020
Expected 2040 to 2050From the 2020 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 291 homes on S Van Ness Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileKitchen: Replace Kitchen And Bathroom Fixture, Cabinets Couter Topreplace Electrical And Outlet Switches And Lightreplace Window And Doorconvert Part Laundry From Bathadd Rafter And Ceiling Joints By Sister Existingreplace Wall Heater Upgrade Electrical To 200 Smpreplace Sling
  • 2020
    permit on fileRoof: Comply With Department Order With An Effective Date Of 10-19-20. Permit To Expire 30 Days From Issuance Date.Window(13) Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Repla
  • 2020
    permit on fileElectrical: Comply W/Department Order With An Effective Date 10-19-20. Permit To Expire 30-Days From Issuance Date. New Restroom And Kitchen Remodel, New Electrical Panel (200Amps),Roofing And Windows
  • 2020
    permit on filePlumbing: Comply W/Department Order With An Effective Date 10-19-20. Permit To Expire 30-Days From Issuance Date. New Restroom And Kitchen Remodel, New Electrical Panel (200Amps),Roofing And Windows

Manage this home to schedule a service or to update the timeline.