LAHomework Sign in
Malibu, CA 90265

4129 Maguire Dr

Built 1999 · 2,072 sq ft
LOT 40,674 SQ FT · 1 STRUCTURE · APN 4461-015-039Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1999
Living area
2,072 sqft
Lot size
40,674 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
4461-015-039

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2019 to 2029From build year 1999
20262035
HVACOn record 2021
Expected 2036 to 2041From the 2021 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: Install A (N) 22Kw Backup Home Generator (Used For Emergencies Only) With (E) 100Amp Main Panel With (N) 200Amp Ats Sub Combo Connecting Generator To (E) Propane Tank (Using 1" Yellow Polyethylene *Gas Line Runs =30 Ft And Electrical Run =30 Ft (Generator Is 5' From Any Open Windows Or Doors)
  • 2025
    permit on filePlumbing: Connecting Generator To (E) Propane Tank (Using 1" Yellow Polyethylene *Gas Line Runs =30 Ft (Generator Is 5' From Any Open Windows Or Doors)
  • 2021
    permit on fileHeating & cooling: Furnace Change Out In Subfloor Crawl Space 80,000 Btus Like For Like, 5 Ton A/C Change Out Left Side Yard Like For Like, 5 Ton Coil Change Out, (14) Ducts Special Conditions: Per Rd Inspector Must Verify No Basement.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2019 to 2029