LAHomework Sign in
Glendale, CA 91208 · Mesa Lila Rd

411 Mesa Lila Rd

Built 1952 · 1,629 sq ft
LOT 12,089 SQ FT · 1 STRUCTURE · APN 5617-015-017Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1952
Living area
1,629 sqft
Lot size
12,089 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5617-015-017

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2011
Expected 2031 to 2041From the 2011 permit
20262035
HVACOn record 2008
Expected 2023 to 2028From the 2008 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 43 homes on Mesa Lila Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileElectrical: Upgraded Panel - 200 Amp
  • 2023
    permit on fileSolar: Roofmounted Pv System Install With 6.8 Kw Dc System Size, 1 * Enphase Encharge Battery
  • 2011
    permit on fileRoof: Residential Reroof As Follows: Sfd With Attached Garage This Is A Change Of Roofing Material (Y/N): No Proposed Roofing Material: Comp Shingle Squares (100 Sf) Being Installed: 33 Tear Off Existing (Y/N): Yes Existing Layers Of Roofing: 3 New Sheathing Being Installed (Y/N): Yes High Fire Hazard Zon
  • 2008
    permit on fileHeating & cooling: Replacing Existing Heating Systme, And New Ducting.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementExpected 2023 to 2028
  • 2031
    Roof replacementExpected 2031 to 2041