LAHomework Sign in
Los Angeles, CA 91403 · Cody Rd

4076 Cody Rd

Built 1999 · 4,122 sq ft
LOT 7,245 SQ FT · 1 STRUCTURE · APN 2277-016-023Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1999
Living area
4,122 sqft
Lot size
7,245 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
2277-016-023

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2019 to 2029From build year 1999
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 106 homes on Cody Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileSolar: (Eplan) Plan Check For Installation Of Energy Storage System. Scope Of Work Includes 2 Energy Storage Systems, 1 Subpanel, 1 Agate And Connected To Existing Main Service Panel. Installation Of Ess Units For An Already Existing Solar System.
  • 2025
    permit on fileSolar: Installation Of A Roof-Mounted Microinverter/Ac Module Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2025
    permit on fileElectrical: Derate 200A Main Breaker To 175A

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2019 to 2029