LAHomework Sign in
Pasadena, CA 91103 · Bellmore Way

407 Bellmore Way

Built 2023 · 6,516 sq ft
LOT 42,682 SQ FT · 2 STRUCTURES · APN 5711-006-033Lot Structure
Nothing due in the next 5 years
Here is what to keep track of. Mark things as done as they happen and your timeline stays current.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2023
Living area
6,516 sqft
Lot size
42,682 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
8
Home type
Single-family
Parcel (APN)
5711-006-033

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

Nothing due in the next 5 years. Each system below shows its typical replacement years.
Typical replacement years
RoofLater
Expected 2043 to 2053Original, built 2023
HVACLater
Expected 2038 to 2043Original, built 2023
Water heaterLater
Expected 2033 to 2038Original, built 2023
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 20 homes on Bellmore Way →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileElectrical: Electrical For (2) Fixtures; Gate Motor And Gate Lock
  • 2022
    permit on filePool: New 20' X 40' Pool With 8' X 8' Spa And 24" Raised Bond Beam/Wall 3' 6" - 5' Deep Max.
  • 2022
    permit on fileGeneral remodel: New Residential Elevator, Interior Modification Only.
  • 2022
    permit on fileElectrical: Install Electrical For New Construction
  • 2022
    permit on fileElectrical: Electrical For Temp Service
  • 2022
    permit on filePlumbing: Plumbing For New Construction
  • 2022
    permit on fileHeating & cooling: Mechanical For New Construction
  • 2021
    permit on fileGeneral remodel: New Construction Of A Two Story Sfr At 6,126 S/F, Basement At 2643 S/F, New Three Car Garage At 724 S/F And Porches At 1,630 S/F.
  • 2020
    permit on filePlumbing: Sewer Cap.
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2008
    permit on fileElectrical: 200 Amps Underground Service

Manage this home to schedule a service or to update the timeline.