LAHomework Sign in
Los Angeles, CA 90027 · Braeburn Way

4034 Braeburn Way

Built 1937 · 2,907 sq ft
LOT 5,546 SQ FT · 1 STRUCTURE · APN 5592-014-007Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1937
Living area
2,907 sqft
Lot size
5,546 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
5592-014-007

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 10 homes on Braeburn Way →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileRoom addition: Eplan New Metal Patio Addition On Top Of (E) Deck.
  • 2020
    permit on fileSolar: (E-Plan)New Pv1 Roof-Mounted Installation For An Existing 200 Amp Service. Scope Of Work Includes 24 Modules, 24 Optimizers, 1 Central Inverter. System Size: 7.56 Kw Dc; 6 Kw Ac
  • 2020
    permit on fileElectrical: Mpu:Main Panel Upgrade
  • 2020
    permit on fileElectrical: De-Rate
  • 2020
    permit on fileSolar: [Eplan] Changes To Approved Plans For Permit # 20041-10000-30426.Changes Include:Module Layout, Added Tesla Powerwall, Will Be De-Rating To A 150A, Placard, And Footing.Changes Have Been Red Bubbled On The Plans.
  • 2017
    permit on fileGeneral remodel: Interior And Exterior Remodel Of Existing 3-Story Single Family Dwelli · OWNER-BUILDER

Manage this home to schedule a service or to update the timeline.