LAHomework Sign in
South Gate, CA 90280 · Ardmore Ave

4020 Ardmore Ave

Built 1954 · 816 sq ft
LOT 2,036 SQ FT · 1 STRUCTURE · APN 6210-006-028Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1954
Living area
816 sqft
Lot size
2,036 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
6210-006-028

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2011
Expected 2031 to 2041From the 2011 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 45 homes on Ardmore Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2018
    permit on fileGeneral remodel: Three (3) Window Replacements Windows Must Meet Emergency Exiting, See Handout. Less Than 18" From Floor And 24" From Doors Must Be Tempered Glass, Smoke Detectors Are Required In Each Bedroom And Hallways Adjacent To Bedrooms Carbon Monoxide Detectors Required Before Final For Jobs Over $1,000.00 V
  • 2011
    permit on fileRoof: Tear Off And Re Roof Dwg And Attached Garage-Sheathing- 10 Sq'S - Recycle Required, Fill Out Wwrp Form And Return To Building And Safety Along With Receipts Before Final. **Note? You Must Specify To The Recycling That Materials Come From South Gate

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2031
    Roof replacementExpected 2031 to 2041