LAHomework Sign in
Glendale, CA 91201 · Thompson Ave

401 Thompson Ave

Built 1925 · 1,736 sq ft
LOT 7,967 SQ FT · 1 STRUCTURE · APN 5625-008-014Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1925
Living area
1,736 sqft
Lot size
7,967 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
5625-008-014

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2012
Expected 2027 to 2032From the 2012 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 245 homes on Thompson Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileSolar: Roof Mount 3.52Kw, 8 Modules, 1 Inverter, 1 Ess, 1 Expansion Pack (Exsiting Solar System Installed) Trenching Required
  • 2023
    permit on fileSolar: Installation Of Roof Mounted Pv Solar: 8.40Kw, 21 Modules With 21 Micro-Inverters
  • 2023
    permit on fileSolar: Installing 3.20Kw Photovoltaic 4/24/23 Revision Changed System Pv Module Layout To Portray The Installed Layout. (Pv-2.0, Pv-5.0) 8 Panels 1 Inverter Revision 6/23 The Pv Equipment Grounding Conductor For The (Egc) Shall Be 6 Awg (Not 10 Awg) Unless Not Subject To Damage. A. Response: Plans Have Bee
  • 2022
    permit on fileElectrical: 400.A Electrical Panel Upgrade
  • 2021
    permit on fileRoom addition: New 2 Bedroom 971 Sf Detached Adu At Rear Of Sfd (One Story)
  • 2012
    permit on fileElectrical: 1 200 Amp Service
  • 2012
    permit on fileRoom addition: New Or Relocated Hvac Or Electrical Service Requires Separate Permits. Ground Floor Addition 645 Sf Add Partition 14'-6", Change 2 Windows For Egress Requirements And 21.Oo Sf Landing Includes Trades
  • 2012
    permit on fileHeating & cooling: New Or Relocated Hvac Or Electrical Service Requires Separate Permits. New Garage 440 Sf Includes Electrical
  • 2010
    permit on fileHeating & cooling: One Fau Up To 100,000 Btu, One A/C Up To 3 Hp, One Electrical A/C & Compressor Added, One Connection Of Equipment To A Gas System
  • 2002
    permit on fileGeneral remodel: 20- X 18- Trellis Patio Only At The Rear Of (E) One Story Single Family Dwelling - - Smoke Detectors For Each Bedroom And Hallways Required.

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2027
    HVAC replacementExpected 2027 to 2032