LAHomework Sign in
Culver City, CA 90232 · Shedd Ter

3959 Shedd Ter

Built 2003 · 3,432 sq ft
LOT 11,790 SQ FT · 2 STRUCTURES · APN 4204-013-037Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2003
Living area
3,432 sqft
Lot size
11,790 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
4
Home type
Single-family
Parcel (APN)
4204-013-037

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2023 to 2033From build year 2003
20262035
HVACWorth a look now
Usually done by 2023From build year 2003
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 12 homes on Shedd Ter →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedRoof: Remove 22 Roofing Squares Of Existing Flat Roof Down To Sheathing On Top Roof And Lower Roof Only. Install A #28Lb Glasbase. Install A Torch Applied Smooth Modified Bitumen Polyurethane Roof Membrane. Install A Final Layer Of Torch Applied Cool Star Granulated Modified Bitumen Polyurethane Roof Memb
  • 2025
    permit on fileSolar: Install (N) 7.38 Kw Pv Array. Plan Check Under E25-0518.
  • 2025
    permit on fileSolar: Install (1) (N) Ess - Tesla Powerwall 3 (11.5 Kw) With (N) Backup Switch And (N) 125A Load Center On This Permit E25-0518. Solar Pv System 7.38 Kw Under Separate Permit E25-0527. Plan Check For Both Under This Permit.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2023
  • Now
    Roof replacementExpected 2023 to 2033