LAHomework Sign in
Glendale, CA 91214 · Abella St

3957 Abella St

Built 1958 · 1,517 sq ft
LOT 6,413 SQ FT · 2 STRUCTURES · APN 5604-009-038Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1958
Living area
1,517 sqft
Lot size
6,413 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5604-009-038

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2022
Expected 2042 to 2052From the 2022 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 34 homes on Abella St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileSolar: Install (9.49Kw/Dc) 26 Roof Mounted Pv Solar Modules With 26 Micro-Inverters.
  • 2023
    permit on fileElectrical: Upgrade Main Service Panel 200A Main Breaker.
  • 2022
    permit on fileRoof: Remove Existing Roof Material And Install New Material
  • 2022
    permit on fileRoof: Remove Existing Shingles And Install New Shingles
  • 2000
    permit on fileRoof: Material:Comp Shingle - No. Of Squares:23 - Tear Of Existing (Y/N):N - Existing No. Of Layers:1 - New Sheathing (Y/N):N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -

Manage this home to schedule a service or to update the timeline.