LAHomework Sign in
Palmdale, CA 93551 · Beacon Ln

39497 Beacon Ln

Built 1989 · 1,681 sq ft
LOT 7,040 SQ FT · 1 STRUCTURE · APN 3003-047-021Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1989
Living area
1,681 sqft
Lot size
7,040 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
3003-047-021

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 73 homes on Beacon Ln →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileElectrical: 39497 Beacon // Ev Charger 39497 Beacon // Ev Charger
  • 2024
    permit on fileSolar: Install 9.900Kw Roof Mounted Pv Solar System (22) Mods And (6) Microinverters. Install (1) Load Center, (1) Ac Disconnect, Upgrade Main Service Panel To 200A.Battery: (1) Enphase Encharge -5O-1P-Na Total Energy =5.0Kwh 39497 Beacon Lane | Install Solar System
  • 2024
    permit on file, unconfirmedHeating & cooling: Replacement Of 4Ton Heat Pump Condenser And Air Handler
  • 2024
    permit on fileKitchen: 180 Sf Kitchen Remodel, Replace Sink, Dishwasher, Garbage Disposal, Kitchen Hood, 2 Lights, 4 Outlets, 2 Switches, & Repiping Of Home. Bathroom Remodel 70 Sf - Covert (E) Tub To Shower, Replace Toilet, (2) Sinks, (1) Fan, (4) Lights, (2) Gfci, (3) Switches. 39497 Beacon Lane | Kitchen And Bathroom R

Manage this home to schedule a service or to update the timeline.