LAHomework Sign in
Long Beach, CA 90808 · Carfax Ave

3932 Carfax Ave

Built 1954 · 1,478 sq ft
LOT 5,851 SQ FT · 2 STRUCTURES · APN 7185-025-003Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1954
Living area
1,478 sqft
Lot size
5,851 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
7185-025-003

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 130 homes on Carfax Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileRoom addition: Garage Conversion To Adu, Including 333.67 Sq Ft Of Interior Space (Excluding Exterior Walls), With 1 Bedroom And 1 Bathroom
  • 2025
    permit on filePlumbing: Garage Conversion To Adu, Including 333.67 Sq Ft Of Interior Space (Excluding Exterior Walls), With 1 Bedroom And 1 Bathroom
  • 2025
    permit on fileHeating & cooling: Garage Conversion To Adu, Including 333.67 Sq Ft Of Interior Space (Excluding Exterior Walls), With 1 Bedroom And 1 Bathroom Finaled 10/8/25
  • 2025
    permit on fileElectrical: Garage Conversion To Adu, Including 333.67 Sq Ft Of Interior Space (Excluding Exterior Walls), With 1 Bedroom And 1 Bathroom Inspected, Approved, And Finaled Garage Conversion
  • 2025
    permit on filePlumbing: Garage Conversion To Adu, Including 333.67 Sq Ft Of Interior Space (Excluding Exterior Walls), With 1 Bedroom And 1 Bathroom Finaled 10/8/25
  • 2022
    permit on fileSolar: Pv System, Roof Mount, 3.24Kw, 9 Modules, Existing Main Service Panel 200A Main
  • 2022
    permit on fileElectrical: New 200A Subpanel
  • 2022
    permit on fileElectrical: Mpu 200A *** Warning! Conductors Shall Not Exit The Back Of Any Surface Mounted Electrical Equipment; *** For Exterior Semi-Flush Mounted Electrical Equipment: Lath/Plaster Shall Not Be Installed Prior To Initial Inspection; *** For Exterior Surface Mounted Electrical Equipment: All Work Done Behind
  • 2019
    permit on file, unconfirmedSolar: Main Dwelling Solar Permit - 31 Modules, 9.765 Kw. See Unc-Solr190819000492 For Detached Structure Permit. Inspection Scheduled For 5/29/25 12-3 Pm. Called Contractor And Left Msg With Inspection Time 12-3Pm.
  • 2019
    permit on fileSolar: Solar Permit For Detached Structure - 4 Modules, 1.26Kw. See Solr190731000366 For Main Dwelling Permit.
  • 2019
    permit on file, unconfirmedElectrical: Upgrade Main Electrical Panel To 225 Amps

Manage this home to schedule a service or to update the timeline.