LAHomework Sign in
Glendale, CA 91214 · Markridge Rd

3900 Markridge Rd

Built 1956 · 2,617 sq ft
LOT 7,685 SQ FT · 1 STRUCTURE · APN 5601-003-006Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1956
Living area
2,617 sqft
Lot size
7,685 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
5601-003-006

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2003
Expected 2023 to 2033From the 2003 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 111 homes on Markridge Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedRoom addition: Interior Alteration To An Existing Single-Family Residence: Kitchen Remodel And Laundry Area Reconfiguration. No Exterior Alterations, Footprint Expansion, Or Land Disturbance. Scope Of Work • Demolition: Remove Existing Non-Bearing Interior Kitchen And Laundry Enclosure Walls. • Kitchen: Install Ne
  • 2010
    permit on fileGeneral remodel: Window Replacement (12) Windows (1) Slider/ With Andersen Fibrex Windows- Remove Aluminum Windows And Replace With Fibrex, Block Frame And No Grids. (13 Total).
  • 2003
    permit on fileRoof: Material:Class A - No. Of Squares:37Sqs - Tear Of Existing (Y/N):Y - Existing No. Of Layers:2 - New Sheathing (Y/N):Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2023 to 2033